BUILDING TIPS Builder's Checklist
| please do before roof fixers arrive on site |
 |
|
|
Valley Boards :
|
Nogged into rafters, top flush with rafter.
|
 |
 |
|
Ridges & Hips :
|
Gerard Box Trim Option - Normally 100 x 25 R/S required.
( Gerard Colortile Only )
Gerard Barrel Trim Option - No ridge/hip board required.
(All Gerard products)
|
 |
 |
|
Fascia Boards:
|
Normally fixed 40 mm square above rafter. 50 mm if rafter over 900 mm centres.
|
 |
 |
|
Roof Edge Protection:
|
Roof Edge Protection may be required, not included in quotation. Please discuss with the contracting manager as to requirements for your site.
|
|
|